
By
Attilio La Manna
Updated November 2, 2026. Miami is discussing a connected network of parks, walking routes and cycling paths. A City of Miami notice published September 29, 2026 announced an October 10 Miami Loop Summit to discuss ongoing projects and future connections. The notice establishes that a public discussion was planned; it does not certify that every route is finished. Here is what buyers and renters should distinguish before choosing a neighborhood based on a greenway map.
The City scheduled the October 10 meeting at Miami Dade College's Wolfson Campus, inviting discussion about how individual parts of the network fit together. An ambitious connected-trail vision can improve access to public spaces, but a summit is not a construction permit, a final map or a promise of an opening date. Verify the status of the exact segment you expect to use.
Miami-Dade County describes The Underline as a planned 10-mile multimodal corridor beneath and alongside the Metrorail between the Miami River at Brickell and Dadeland South. Phase 1, Brickell Backyard, opened on February 26, 2021. Phase 2, from SW 13th Street to SW 19th Avenue, opened April 24, 2024. Phase 3 is a 7.36-mile project from near Vizcaya to Dadeland South, with completion expected in 2026 in the county's published plan. That expectation is not proof that every stretch or crossing is open on November 2. Check current detours before planning a daily route.
The official Phase 3 description calls for bioswales, bioretention ponds and below-ground drainage, plus 1,800 new trees and palms and about 350,000 native plants. Planned amenities include improved crossings, lighting, bike facilities and areas for community events. These are project targets, not a guarantee that all landscaping is installed or that nearby properties are protected from flooding. Ask what is actually built, inspect the street, and check flood exposure separately.
The county describes Ludlam Trail as a 5.6-mile shared-use corridor along a former railway right-of-way, from NW 7th Street to SW 80th Street. Its goals include safer walking and cycling links to schools, parks, homes and transit. The county's project page describes design and public engagement, with construction phases dependent on funding. A proposed path on a planning map should never be represented as a completed commuting option.
The Miami Downtown Development Authority identifies the I-395 MacArthur Causeway as a gap in waterfront pedestrian and bicycle connections. The DDA chose the Bay 2 Enhanced Connector as its preferred design in February 2026, and the City Commission recommended it for Phase 1 design on March 12, 2026. The agency explicitly reports no completion timeline. Before relying on a continuous waterfront route, verify the actual open sections and safe alternatives.
Greenways may create more opportunities to walk, exercise and meet neighbors. They can also change traffic patterns and introduce construction disruptions. None of this guarantees appreciation, rental income or a particular property value. Compare the home's condition, total costs, location and daily practicality with the infrastructure that is actually available, not just a future rendering.
For a home purchase, complete the Get2Living buyer inquiry form; for an apartment search, use our rental inquiry form. Tell us which transit stops, parks, safe walking routes and community spaces matter most. We can help organize your search while official agencies remain the source for construction and route status.
Sources checked November 2, 2026: City of Miami, September 29 summit notice; Miami-Dade, The Underline; Miami-Dade, Phase 3; Miami-Dade, Ludlam Trail; Miami DDA, I-395 Baywalk bridge. Photo: Phillip Pessar, The Underline Brickell, April 17, 2026, CC BY 4.0; unmodified photo of an existing public space, not proof of future trail completion. Educational information, not individualized legal, engineering, insurance or investment advice.